Hey there, if you’re working with dry-type transformers—whether you’re a facilities manager, an electrical engineer, or someone who just has to keep those big power boxes humming without surprise shutdowns—you’ve probably heard the term partial discharges (PDs) thrown around. Let me cut to the chase: I’m not here to give you a stuffy textbook lecture. I’ve been in the dry-type transformer game for over a decade, selling these units and helping clients troubleshoot headaches that start with a tiny PD that turns into a full-blown disaster. Partial discharges are those tiny, electrical “leaks” that happen when insulation in your transformer gets stressed—super small at first, but if you ignore ‘em? They eat away at insulation like termites, leading to overheating, short circuits, and a transformer that dies way before its expected lifespan. The good news? You don’t need a lab full of gear to spot ‘em. I’m gonna walk you through exactly how to detect PDs in dry-type transformers, the tools we actually use on our service calls, and the mistakes I see folks make all the time. Dry-Type Transformer

First, let’s get one thing straight: dry-type transformers are different from oil-filled ones, right? They use air, epoxy resin, or cast coils for insulation, not that flammable oil. That changes how PDs show up. PDs in dry-types don’t make the same chemical fumes you’d get from oil breakdown, so you’ve gotta look for other signs. The first step is regular visual checks—don’t skip these, even if you’re busy. Last year, a client of mine had a 1500kVA unit that was showing “fine” on its monthly log, but when our tech popped the panel open, he spotted tiny, dusty black spots on the epoxy coil’s edge. Turns out, that was the early stage of PDs—microscopic sparking eating at the resin, leaving carbon traces. Another visual sign? Weird discoloration on the busbars or coil supports, or even a faint, crackly smell that’s not quite burning plastic but more like ozone (think the smell after a lightning strike). If you see any of that, don’t wait—move to the next step.
Next up, the go-to tool most of our clients (and our service team) use is a PD detector with ultrasound technology. Wait, I know what you’re thinking—ultrasound? Like the kind doctors use? Kind of! PDs emit high-frequency sound waves (way above what humans can hear, usually 20kHz to 100kHz, depending on the PD size), and these detectors pick ‘em up. Here’s the trick: you don’t just wave it around randomly. You start at the top of the transformer (where charge tends to collect) and work your way down each coil, busbar, and connection point. Hold the detector about 6 to 12 inches away—too close and you’ll get distorted readings, too far and you’ll miss small PDs. Our techs always bring a calibrated one, because cheap knock-offs pick up all kinds of background noise (like that air handler running down the hall) that make it hard to tell real PDs from junk. Last quarter, we had a client who thought their transformer was having PDs, but it turned out the detector was just picking up a loose metal vent cover. Moral of the story: always double-check with another reading, and note where the noise is loudest—if it’s only at one connection point, that’s way more likely to be a real PD than a consistent hum across the whole unit.
Then there’s the electrical method: high-frequency current (HFC) monitoring. This is where you attach a current sensor to the transformer’s neutral or phase leads—these sensors pick up the tiny, high-frequency electrical pulses that PDs send out. We recommend permanent HFC monitors for transformers that run 24/7 (like data centers or manufacturing plants) because they track PDs over time, not just a snapshot. For example, a warehouse we supply has a 2000kVA transformer that’s always running heavy during shipping season. Their HFC monitor alerted us to a spike in PD activity back in March, and we sent a tech to tighten a loose bolt on the primary connection before it turned into a big issue. The cool thing about HFC is it can distinguish between PDs and other electrical noise (like motor starts) because PD pulses have a specific frequency signature. It’s not as easy to use as ultrasound, but if you have a critical transformer that can’t go down, this is worth the investment.
Wait, can’t forget about the thermal camera check! Yeah, I know—thermal is mostly for overheating, but PDs cause tiny hot spots (like 1-2°C higher than normal) on the coil insulation, and a good thermal imager can pick that up. The key here is to do thermal scans when the transformer is under load—100% or close to it—because PDs only show up when the insulation is stressed by electricity. We always tell clients to scan at peak operation, not when the plant is half-empty. A client in the food processing industry did this last year and caught a hot spot on a cast coil that was just starting to have PDs—turns out, the epoxy had a tiny bubble from the manufacturing process, which let air get in and caused partial discharges. They fixed it before the coil failed, and saved like $20k in downtime costs. That’s the kind of win we love.
Now, let’s talk about what not to do. A lot of folks skip regular testing and only check for PDs when the transformer is acting up—big mistake. PDs grow over months, not days. Another mistake: using the wrong tools for the job. If you have a small, residential dry-type transformer (like the ones for a commercial building’s HVAC), you don’t need a $10k HFC monitor—an ultrasound detector that costs a few hundred bucks will work fine. But if it’s a 10,000kVA unit for a hospital, you need the more precise gear. Also, don’t ignore “small” noise or discoloration. A friend in maintenance once told me his team thought a faint ozone smell was just a new carpet off-gassing, but it was actually a PD starting on a transformer in the basement. By the time they realized, the coil was half-insulated away. Oops.
Let me wrap this up with a quick, actionable list you can use tomorrow if you’re dealing with a dry-type transformer:
- Do a visual check first: Look for black carbon traces, ozone smell, discolored coils/busbars.
- Use an ultrasound detector to scan each component at 6-12 inches, note where the “static” noise is loudest.
- If it’s a critical unit, add a simple thermal scan during peak load to spot hot spots tied to PDs.
- For units running 24/7, look into a basic HFC monitor to track PD activity over time.

And here’s the thing: I’m not just selling transformers—we offer post-install PD testing and maintenance checks for all our units, not just brand new ones. If you’re noticing weird sounds, smells, or random power blips from your dry-type transformer, don’t wait for it to go dark. Reach out, tell me your model, how old it is, what you’re running through it, and we can walk through exactly what testing you need (no sales pitch, just real advice from someone who’s dealt with this a hundred times).
330kV ~ 400kV Oil Immersed Transformer References:
- IEEE Std C57.12.01, Standard for Dry-Type Distribution and Power Transformers
- National Electrical Manufacturers Association (NEMA) Publication No. TP 1, Partial Discharge Measurements for Dry-Type Transformers
- Power Quality Association, “Partial Discharge Detection in Dry-Type Transformers: Best Practices for Field Testing”
Shandong Xunchi Electric Co., Ltd.
Shandong Xunchi Electric Co., Ltd. is one of the most professional dry-type transformer manufacturers and suppliers in China, featured by quality products and low price. Welcome to wholesale advanced dry-type transformer made in China here and get quotation from our factory. Customized orders are welcome.
Address: No.1 East Campus of Dachi Company on the North Ring Road, Yongchang Street Office, Chengwu County, Heze City, Shandong Province, China
E-mail: sdxcdq@126.com
WebSite: https://www.china-xunchielectric.com/